Site planning
- Building placement and site dimensions
- Access, parking and circulation
- Water, sewer or septic information
- Survey, easement and utility coordination
Our in-house licensed PE prepares site drawings and calculations for building placement, access, parking, utilities and drainage. Your survey and existing grades establish the starting point for the design.
We review property boundaries, easements, elevations and the proposed use before drawing the site layout. Additions and paved areas can affect drainage. We identify any missing survey or flood information and coordinate the site design with the building plans.
We prepare Orlando and Orange County site plans, including projects in Apopka, Ocoee, Winter Garden, Windermere and Oakland. Work in nearby Seminole, Osceola and Lake County is scoped from the property records and proposed development.
Explore local coverage and site visitsTell us what records are available. We review the property and proposed work, then explain what survey information is needed before design begins.
Send the current drawings, survey and issued comments. We identify the response, calculations and revised sheets needed within the engineering scope we can take responsibility for.
Send the address, current survey, proposed site use and any review comments. Mention septic systems, nearby water or existing drainage concerns.